|
Date: 01/09/2025 |
|
Vsl No |
95302 |
Permit No |
95116 |
Expires |
11/30/2026 |
Vsl Status |
ACTIVE |
Vsl Code |
U2E -
UNFIRED, 2 YR, EXEMPT |
Vsl Type |
HEX -
HEAT EXCHANGER |
Service |
PROC PROCESS |
Manuf |
COLUMBIA HYRDO |
Manuf Yr |
2006 |
Const Code |
U -
UNFIRED PRESSURE VESSEL |
Natl Brd # |
149766 |
Serial # |
149766 |
State # |
|
Diameter |
Len |
Volume |
13.00 |
Horse Pwr |
|
Max Pressure |
150 |
SV Set Press |
150 |
SV Cap |
1218000 |
Fired |
N
Fixed
Y |
Manned |
N |
Alarm |
N |
Fuel Code |
NO -
N/A |
Comments |
31550 |
No Insp |
7 |
Prev Site |
|
|
Insp # |
Charge Code |
Due Date |
Inspected |
Type |
Result |
935736 |
30 |
11/30/2026 |
|
E |
|
849305 |
90 |
11/30/2022 |
09/07/2022 |
E |
SATISFACTORY |
743823 |
42 |
11/30/2018 |
08/30/2018 |
E |
SATISFACTORY |
712164 |
42 |
11/30/2014 |
06/06/2014 |
E |
SATISFACTORY |
596788 |
42 |
11/30/2010 |
10/07/2010 |
E |
SATISFACTORY |
549473 |
42 |
11/30/2008 |
09/29/2008 |
E |
SATISFACTORY |
530808 |
12 |
07/11/2007 |
07/11/2007 |
E |
SATISFACTORY |
|